Mussels and Proposal Work
mussel pilot experiment
MS proposal
PhD proposal
Projects Touched Today
- Mussel pilot experiment
- MS proposal
- PhD proposal
New Knowledge
Day 18. Mussel Check at 1624
Visual tank inspections looked good for airflow and water clarity. Mussels were still aggregated in their respective bags/ coolers. There is a smell to the tanks, but that has to be waste products since there are no mortalities.
Temperature
Blue= 11° C
Red= 18° C
Salinity
Blue= 26 psu
Red= 27 psu
Mortality
Blue= 0
Red= 0
Old Tricks
- Reviewed previous day’s work in both proposals
- Total new words added across both proposals: 941
Questions or Concerns?
- None.
Tomorrow’s Plan
Nothing concrete except for checking the mussels. 1/11 is Sunday.
Didn’t complete today, so will move this to next week. Pull all of my pilot observations out of my notebook and into their own table. I will need this information to help guide the continuation of the experimental design for the larger experiment.